P13 Checking authorization and removing a specific measure
Full cycle card • project route • NAV · p. 003
When to open. It is necessary to allow access, resume work, transfer material, complete special surveillance, revise an event-related measure, or lift a territorial restriction. Completed processing or the absence of new messages does not in itself close the issue.
The current frequency of clinical monitoring is changed by the responsible physician according to P07 · p. 161. Legal assessment is required in applicable cases, especially when limiting rights.
For whom. An authorized person making the relevant decision, specialized medical and engineering specialists, the necessary independent expertise.
Do it now. Name the specific action that is supposed to be allowed and check the sufficiency of the grounds for it.
1. The decision owner defines the subject of the clearance, the people affected, the purpose of the measure being maintained, and their authority. Confirmation: Medical supervision, access to premises and transfer of material are considered separately.
2. The profile group provides information about the source, the actions performed, and the result of the check. Validation: Limitations of methods, quality of observation, and unexplained signals are noted. A negative research result does not allow drawing conclusions about threats that the method is not capable of assessing.
3. An engineer or medical supervisor checks the readiness of the corresponding function for the proposed mode. Confirmation: suitability has been confirmed under the required conditions; the fact of repair, completed course or treatment does not replace the evaluation of the result.
4. The security officer, and if necessary the legal team, consider the consequences of continuing the measure, less restrictive alternatives that are sufficient, and the need for an independent opinion. Confirmation: uncertainty is not used as the sole basis for an infinite limitation. [12, 19]
5. The authorized person records the permitted action, remaining restrictions, residual uncertainty and conditions for re-enforcement. Confirmation: implementers and affected people have received the same decision and know where to report changes in the situation.
6. The designated monitoring service confirms that the intended monitoring is indeed available after a mode change. Confirmation: there is a person responsible, a communication channel and a certain point of revision.
Transition. New impact - P03 · p. 157 or P04 · p. 158; human deterioration - P02 · p. 156; unconfirmed result of source elimination - P09 · p. 163. For follow-up and control closure, P14 · p. 168 is applied. If the decision is postponed, it is indicated what information or conditions are needed for a new consideration and who is responsible for obtaining them.