P04 Barrier violation
Full cycle card • project route • NAV · p. 003
When to open. The provided protection is damaged, the reliability of control is lost, or a possible impact beyond the accepted limit is detected. The type of agent may remain unknown.
For whom. Incident Commander, Engineer in Charge, Biosafety or Planetary Protection Specialist, Medical Service.
Do it now. Check people and vital signs; determine which barriers actually work and which transmissions require revision.
1. The discoverer reports the violation and safely terminates the associated optional operation within the scope of its preparation. Acknowledgment: signal received; Personnel do not attempt to independently investigate or eliminate unknown material.
2. The medical officer in charge checks the need for assistance and possible contacts. Urgent cases are sent to P02 · p. 156, possible exposure without symptoms - according to P03 · p. 157. Confirmation: assistance has not been delayed by engineering investigation.
3. The engineer evaluates available operating modes, connections between systems, and resource constraints. Changes in ventilation, power supply or division of compartments are carried out according to the site plan. Confirmation: Human, fire and life safety implications are considered prior to reconfiguration.
4. A specialized specialist clarifies the boundaries of the expected exposure and the transmission history. Confirmation: the work map shows confirmed connections, possible connections and gaps; the administrative boundary is not accepted as a proven physical boundary.
5. The supervisor assigns acceptable routes of assistance and necessary restrictions on unnecessary transfers. For each barrier, the owner, conditions of applicability and verification method are indicated. Confirmation: the receiving party is notified before the scheduled transfer; rescue actions have a separate procedure. [1, 11]
6. The Security Action Officer reviews common security dependencies. Confirmation: A single power, sensor, or communications failure is not misrepresented as multiple independent failures.
Transition. Insufficient resources or communication - P12 · p. 166; going beyond the capabilities of the object - P11 · p. 165; organization of source elimination - P09 · p. 163. The resumption of a specific operation requires a decision under P13 · p. 167. The features of the station are specified according to S1 · p. 171, external work of the apparatus - according to S2 · p. 172, laboratories - according to S4 · p. 174.