Working Forms
Forms F01–F10 - applications for local work [P]. They can be printed, filled out in Word, or transferred to the current system. They do not require everything to be filled out before rescue begins. The family has the right to combine the required fields on one sheet; the organization distributes them among those responsible.
An empty field simply means that there is no entry. Indicate significant unknowns directly: “not established”, “not verified”, “confirmation not received”. An entry requires an event designation, version, and author. When making changes, keep the previous entry and the reason for the change. Do not retroactively convert a hypothesized cause into an observed fact.
The general kit includes only the necessary information. Medical details, personal data and information about protected objects are transmitted according to the appropriate access order. The suitability of the form itself is checked on the local task according to T02.
F01 Event Record
Event ID: ____________________
Form code F01 and record version: ____________________
Compiler, role and contact: ____________________
Date and time of recording, time source and known restrictions: ____________________
Place and sequence of observations; what is known about the accuracy of the binding: ____________________
Directly observable effects: ____________________
Who needs help and what function is impaired: ____________________
Source materials, their origin and available custodian: ____________________
Possible explanations; information against each of them: ____________________
Actions taken and separately observed result: ____________________
Essential unknown and the decision that depends on it: ____________________
The following is responsible, review condition and available return channel: ____________________
Example [S]. “In Academic Building B, two devices show different values; The general time source has not been verified. No complaints have been received yet; there is no connection with the neighboring building. The suitability of the entire building has not been confirmed. The duty officer checks the available standard diagnostics, the scientific group saves the original records. Review if new symptoms occur, life support fails, or independent monitoring is obtained.” The recording does not prove a spatial anomaly or declare the absence of danger.
F02 Decision and Its Limits
Event ID: ____________________
Form code F02 and record version: ____________________
Date and time of compilation with known restrictions: ____________________
Compiler and contact: ____________________
Event, decision version, author and authority: ____________________
Nearest protected function: ____________________
Facts at the time of decision: ____________________
Available options and consequences of waiting: ____________________
Selected action, performers and resource: ____________________
Scope and what is not yet permitted: ____________________
Expected observable result: ____________________
Harm that the action itself may cause: ____________________
Stop sign and available alternative: ____________________
Who received the decision and who could stay with the old version: ____________________
Example [S]. “Stop sending new groups to point A due to loss of confirmed reception. For a group that has already been dispatched, the dispatcher clarifies the position and agrees on the nearest suitable location. The further route is not assigned automatically. Revision after host confirmation or new path availability information.”
F03 Handover of Responsibility
Event ID: ____________________
Form code F03 and record version: ____________________
Date and time of compilation with known restrictions: ____________________
Compiler and contact: ____________________
Who delegates responsibility, to whom and for what work: ____________________
Time and method of confirmation of acceptance: ____________________
Current purpose and applicable versions: ____________________
People waiting for help and unfinished obligations: ____________________
Functional performance and immediate limitations: ____________________
Unverified messages and disagreements: ____________________
Canceled orders, the cancellation of which has not yet been communicated to everyone: ____________________
Next action, stop condition and substitute: ____________________
Where are the log, source data and backup set: ____________________
Example [S] of reverse confirmation. “Accepted the coordination of point B. The main unfinished task is to confirm the reception of the group on the way. Information regarding the suitability of additional premises has not yet been received; It cannot be used as a ready reserve. If the main connection fails, we keep a local log and maintain the established procedure for assistance.”
F04 Resource Balance
Event ID: ____________________
Form code F04, version, date and originator: ____________________
Resource, unit of account and function it provides: ____________________
Location, confirmed access and basis for suitability assessment: ____________________
Inventory snapshot at the time of decision
[P] The exclusion categories below do not overlap: one unit cannot be deducted as both unfit and unavailable at the same time. If the intersection is unknown, the positions are first checked and the remainder is not declared accurate. Delivery in transit is not included in on-hand inventory.
Position | Quantity | Reason and confirmation |
Physically verified total quantity | ______ | ______ |
Unsuitable or unconfirmed suitability | ______ | ______ |
From suitable: not available for issuance | ______ | ______ |
From suitable and available: already allocated to other tasks | ______ | ______ |
Free balance for the current task | ______ | ______ |
Observed flow rate, range and mode at which it was obtained: ____________________
Expected delivery separately: sender, confirmed stage, acceptance conditions: ____________________
General dependencies: personnel, energy, keys, delivery, packaging, issue: ____________________
Revision condition and who performs the following reconciliation: ____________________
Movement of available balance
Each change has a sign, magnitude and basis: actual reception, delivery, change in availability, access or allocation. Correction of the previous error is noted separately; it is not masquerading as a new supply. For the next shift, unfinished obligations are indicated.
Moment and recording number | Change; document or observation | Remaining after recording | Who confirmed |
______ | ______ | ______ | ______ |
______ | ______ | ______ | ______ |
______ | ______ | ______ | ______ |
______ | ______ | ______ | ______ |
______ | ______ | ______ | ______ |
Example [S] calculation
[S] In the conditional sets, 800 units are taken into account: 100 are excluded due to suitability; another 150 suitable units are unavailable; another 50 available units are already allocated to another task. Available 800 − 100 − 150 − 50 = 500 sets. With the observed consumption of 180–220 sets per day, the design horizon is approximately 2.3–2.8 days under constant conditions. This is an arithmetic example of recordkeeping, and not a standard of nutrition, treatment or safe autonomy.
The issue 40 is entered into the journal: “−40, statement 12; remainder 460; accepted by the responsible one." The promised 300 kits are so far reflected only in the expected delivery. If it turns out that part of the balance is unavailable, a new calculation is performed immediately. For a long crisis, F04 is added to F10: the exhaustible supply must be maintained by a verifiable replenishment process.
F05 Hypothesis and Test of a Protective Claim
Event ID: ____________________
Form code F05 and record version: ____________________
Date and time of compilation with known restrictions: ____________________
Compiler and contact: ____________________
Observation without explanation: ____________________
Testable hypothesis and alternatives: ____________________
Data in favor and against each version: ____________________
Data origin and general dependencies: ____________________
What differentiates the versions and is it safe to access: ____________________
Limitation of the method and scope of applicability: ____________________
What function should the proposed protection preserve: ____________________
Signs of measurement failure and failure of the protection itself: ____________________
Independent inspector and inspection result: ____________________
The decision that can be made and the basis for its cancellation: ____________________
Example [S]. “After changing the equipment mode, the signal decreased. It is not established whether the impact or sensitivity of the measurement has decreased. The entire object cannot be declared secure before checking for an available control channel. The change is saved only within a separate confirmed standard function.”
F06 Public Message and Correction
Event ID: ____________________
Form code F06 and record version: ____________________
Date and time of compilation with known restrictions: ____________________
Compiler and contact: ____________________
Who issues the message; version, time and scope: ____________________
What is confirmed: ____________________
What should a person do now: ____________________
Who needs additional help and how to request it: ____________________
Which previous instruction has been changed: ____________________
What remains unknown: ____________________
Where and when will the next message be; what events require an extraordinary update; what is reported in the absence of new information: ____________________
Delivery methods without a network and in accessible formats: ____________________
How understanding is tested and who is not yet covered: ____________________
Example [S]. “Training point A is temporarily not confirmed to accept new groups. The previously announced direction to this point has been changed. People who have not yet started the journey need to get up-to-date guidance through an established local channel. For those already on the way, the coordinator will arrange reception separately. The cause of the unusual sighting remains under investigation." In the actual message, general words are replaced with specific proven channels and actions for the relevant territory.
F07 Authorization to Return or Resume a Function
Event ID: ____________________
Form code F07 and record version: ____________________
Date and time of compilation with known restrictions: ____________________
Compiler and contact: ____________________
Territory, object or function: ____________________
What exactly is allowed and for whom: ____________________
Validated tests and their limits: ____________________
Residual limitations and unresolved issues: ____________________
Availability of assistance, water, communications, transportation and essential services: ____________________
People for whom return is not yet possible; how the help continues: ____________________
Sign of repeated restriction and who makes the decision: ____________________
How the population will receive a change in clearance: ____________________
Responsible, date, version and next revision: ____________________
Example [S]. “The operation of a specific function in the inspected premises is permitted under the specified restrictions. The permit does not apply to the neighboring site, information about which is not available. If a new indication of unsafety occurs, the person responsible shall cease the associated use and report the applicable action.” Such authorization is limited to proven grounds.
F08 Change to a Local Procedure
Event ID: ____________________
Form code F08 and record version: ____________________
Date and time of compilation with known restrictions: ____________________
Compiler and contact: ____________________
Procedure, old and new versions: ____________________
Reason for change and source material: ____________________
What actions and related documents are affected: ____________________
Who checked the content and feasibility: ____________________
When and where the new version goes into effect; order for already started tasks: ____________________
To whom the change was delivered and whose confirmation is missing: ____________________
Where is the old version saved and how is it marked: ____________________
Method for checking that the original defect has been eliminated: ____________________
The result of the first application and remaining questions: ____________________
Example [S]. “After the exercise, the reception procedure was changed: before the scheduled departure, they receive up-to-date confirmation of the readiness of the receiving party. After arrival, the actual reception of people and the necessary assistance are separately confirmed; only then the corresponding transfer stage is considered completed. The test is carried out on a conditional transmission with the loss of one channel. The change does not negate immediate rescue from a dangerous place; this case is separately indicated on the card.” The success of an edit is determined by the break being resolved, not by the release of a new version of the file.
F09 Record of Confirmed Cessation of Exposure
Event ID: ____________________
Form code F09, version, date, originator and authority of the decision maker: ____________________
Specific impact, protected function and location/condition boundaries: ____________________
What state is being claimed: harm reduction / stopping the spread / stopping the process / remaining under control / ending the active response. Selected and reason: ____________________
Initial state to measure and reliability of its description: ____________________
Measure performed, performers, time or sequence: ____________________
Output to be tested | Observation and data provenance | Output limit |
Reducing or stopping specific harm | ________ | ________ |
Preservation of the ability to detect previous influences | ________ | ________ |
Independent verification of the result | ________ | ________ |
No transfer of harm to another function in the tested area | ________ | ________ |
What alternative reasons for the change are still possible: ____________________
Side and delayed effects; what remains untested: ____________________
F09 Continued. Foundations and remaining tasks
Why the selected measure can be considered the cause of the result, or why causality has not yet been established: ____________________
Remaining restrictions and specific permitted actions: ____________________
Signs of re-occurrence, observation channel, responsible and available reserve: ____________________
To whom the services, assistance, environmental monitoring and appeals of the population were transferred: ____________________
Who independently reviewed the recording; disagreement and decision on it: ____________________
Next revision by date and event: ____________________
[P] This form is used with G12, S05, S10, C14 and G11. Any blank item does not mean a positive result. If only harm reduction is confirmed, this particular condition is indicated in the title of a particular record. Completion of the active phase does not cancel remaining obligations and does not constitute an order for everyone to return.
Example [S]. “After Node A stops operating under the tested conditions, the same supply failure no longer occurs. Independent monitoring shows the performance of the surveillance. Causality is supported in part by consistency and technical verification, but access to the unknown source itself is lacking. The specific chain of exposure has been confirmed to have stopped; the disappearance of the source is not declared. We will allow a limited mode of service with supervision, a responsible operator and revision when conditions change.”
F10 Restoring Functions and Passing on Skills
Event or Local Plan ID: ____________________
Form code F10, version, date, compiler: ____________________
Plan horizon and events at which it is revised: ____________________
Function and desired result | Replenishment or maintenance process | Condition without which the process does not work |
________ | ________ | ________ |
________ | ________ | ________ |
________ | ________ | ________ |
________ | ________ | ________ |
For each significant dependency, use a separate card on the next sheet. Copy it according to the number of functions; The plan ID and version link both sheets. An empty line means no entry, not confirmed readiness.
F10 Continued. Card of one critical dependency
Event/Plan: ____________________ Record version: __________
Function name: ____________________
Person with verified competence and actual availability: ____________________
Replacement; what the replacement already knows and what still needs training: ____________________
Documentation: location, version, language, offline access, hardware compliance check: ____________________
Compatible parts, consumables, tools, power and working conditions: ____________________
Work that can be done locally and its limit: ____________________
What remains dependent on external supply or specialist: ____________________
Verifiable result of repair/training and who accepts it: ____________________
Seasonal window or other point after which the task changes: ____________________
To whom the maintenance log and unfinished task are sent: ____________________
[P] The form complements C19, G08, G16 and T05. Having an instruction file is not the same as having a skill, the right tool, or a safe clearance. For agriculture, water, feed, veterinary care, seed, labor and product suitability decisions are recorded separately. Unconfirmed product safety does not become confirmed due to shortages.